For most small business websites, planning should take one to three weeks before any design starts. Less than a week usually means the hard decisions were skipped and will come back during design, where every change costs more. More than a month usually means nobody is making decisions at all. The calendar time is mostly waiting, and the actual working hours are fewer than people expect.
I'll break down where that time goes, because "planning" sounds vague until you see the list.
What happens during the planning weeks?
Four pieces of work, roughly in this order.
First, a discovery conversation, usually 60 to 90 minutes, about the business, the customers, the competition and what the current site does badly. Second, naming the primary audience and the one message, which is often settled in that same meeting and then written down for review. Third, the sitemap: every page written down with its single job, its URL and its next step. Fourth, the content inventory, meaning which pages need new writing, which photos exist and which need to be shot, and who is responsible for each piece. That last one is the piece that decides the whole schedule, because a site can't launch faster than its content arrives, and content is the thing clients most often underestimate. A contractor may have hundreds of project photos, but only a handful that are sharp, well lit and show finished work.
If there's a redesign involved, add a fifth: the redirect map, listing every old URL and where it will point.
Why not skip ahead to design?
Because design is where decisions get expensive.
In a written plan, cutting a page is a quick edit. After design, cutting a page means reworking navigation, rewriting links, adjusting layouts and running another review round. The work doesn't disappear when you skip planning. It moves later, into the most expensive part of the project. I'd rather spend an extra week on the written plan than an extra month in revisions, and so would any client who's been through a redesign that dragged on.
Some designers disagree with this approach, and I understand their reasoning. They'd say clients don't really know what they want until they see a design, so it's faster to show one early and react. There's truth in that for visual taste. Taste rarely derails a project, though. Unclear audience, missing content and disagreements about what the business is selling do, and a mockup settles none of them.
Planning something like this? Evan plans, shoots and builds websites, brands and campaigns from Baton Rouge. Book a Chat and tell him what you are working on.
What makes planning drag on?
The planning itself rarely drags. The gaps between meetings do. A plan waits on one decision maker who is traveling, or on photos someone promised to dig up, or on the second partner who wasn't in the first meeting and now wants to revisit the audience. Each wait adds days.
A few habits keep it moving.
- Put every decision maker in the discovery meeting, even for half an hour.
- Name one person on your side who approves the plan.
- Gather existing photos, logos and brand files into one shared folder in the first week.
- Set a date for sign-off before the planning starts, so it has an end.
The biggest delay is almost always content. If nobody on your team has time to write service pages, say so on day one. It changes the plan, because either someone else writes them or the site launches smaller and grows later. Both are fine. Pretending you'll find the time is what isn't.
Can planning be too short?
Yes, and here's where I'll admit a tradeoff.
For a single landing page or a quick campaign microsite, a full planning phase is overkill. A clear audience, one message and one call to action can be settled in a single working session, and spending two weeks on it would be padding. The one-to-three-week range is for real websites with several pages, several audiences and content that has to be written or shot. Scale the planning to the size of the thing you're building.
How much of your time does planning need?
Less than the calendar suggests. For a typical small business site, the client side is often a few hours across those weeks: the discovery conversation, a review of the written audience and message, a review of the sitemap, and gathering existing photos and materials. The planner's side is more, because writing up the plan properly takes time. If you're a marketing manager coordinating several stakeholders, budget extra hours for collecting their feedback in one place instead of five email threads.
One practical tip: block two short review sessions on the calendar at the start, one for the audience and message and one for the sitemap. Reviews that happen in a scheduled 45 minutes get finished. Reviews that happen "when someone gets a chance" take a week each.
How do you know the plan is done?
When you can hand the sitemap to someone who has never heard of your business and they can tell you who the site is for, what it says and what each page does. When every page has an owner for its content. And when everyone who can say no has already said yes. At that point, design can start, and it usually goes faster than people expect because the arguments are already settled.
Ready to plan yours?
Every project in our website design service starts with this planning phase, and if you want the thinking without the build, our creative strategy work delivers the plan on its own. You can see finished examples of planned sites in the portfolio. Book a Chat and we'll set a realistic planning calendar for your project.